Here Studios,
Bristol

This project was to strip out redundant areas of the existing office complex and re-generate these into a dynamic workspace with break out areas for meetings or client calls. The reception and the cafeteria were also refreshed along with the WC areas. The front of the building received bonded gravel and an external seating area for the cafeteria.

1.jpg

Value £1.2m
Duration 20 weeks